菠萝蜜视频app在线观看

Your location: Home Page > Mortar conveying pump > Fine aggregate concrete pump
 Handwork two structure delivery pump

Handwork two structure delivery pump

Classification: fine concrete pump Order hotline: 15131066788

Introduction and parameters

Handan two structural delivery pump products:

Handwork Two structure injection pump Using spiral conveying slurry, vibration network filtration and double cylinder reciprocating operation can fully convey all kinds of mortar and fine aggregate concrete in building application. The two construction column casting machine has the characteristics of large displacement, high pressure, labor saving, material saving and flexible movement. The construction workload of a two structure grouting pump is 200 days per day (0.18 cubic meters per column), which is equivalent to the workload of 48 workers. By comparison, the construction equipment of the construction column can shorten the construction period of 90% of the filling project, and save several thousand yuan per day for manual wages. The two construction column pump can be started by one person operation, but the traditional perfusion construction is of great intensity. Therefore, it is always faced with problems such as lack of construction and recruitment difficulties. The development of the two structure grouting pump has solved the problem of difficult pumping of concrete under some special conditions, which has improved the progress of construction, reduced the intensity of labor, and reduced the labor cost in the process of construction. Input.
     
The two working steps of Hanzhu's construction column pump are: check the appearance of the machine, cause damage to the machine due to long distance transportation, especially the electrical appliances in the electric box, whether the wires are falling off or not. Starting the motor is to see if it can work normally; put the hopper, insert the 1 meter or 0.58 meter cage according to the height and angle of the construction, and the angle of the upper and lower blades should be aligned according to the helix angle. Then the ash outlet is installed. Lock the buckle; the cage in the pipe. (the top of the cage is higher than the height of the pouring column or lintel) to the construction point, and the ash outlet hose is extended to the column into the ash hole. When starting, the ash should be used to damp the pipe, and the remaining ash in the pipeline will be exported, and then the hopper and the ash pipe will be cleaned.
Han construction two construction pump features:

1. the advanced s pipe valve reversing can meet the transportation of concrete. The S pipe valve is equipped with floating wear ring, which automatically compensates for wear and tear, and has good sealing performance.
2. wear resistant alloy material, with longer life and higher outlet pressure, can meet the requirements of high rise pouring and long distance construction. The hydraulic system adopts double circuit open system, with high commutation speed and high efficiency.
3. the advanced cooling and cooling system of hydraulic oil cooling window sill has no need for water supply. It is simple to use, has the function of anti pump, reduces the blockage of pipelines, and has automatic centralized lubrication system.
4. the service life and electrical parts are controlled by PLC, with operation characteristics and wired remote control handle for electric box, which is convenient for operation.


The parameters of handwork horizontal two construction column pump are:
Theoretical throughput 6m/h
Work form S tube valve
Charging height 0.7m
Aggregate size 2-1.5 inch cm
Hydraulic system form Numerical control electronic control system
pressure 15MPa
Working pressure 10MPa
Hydraulic oil cooling Air cooling
Vertical transport distance 20m
Horizontal transportation distance 50m
Diameter of pipe 65mm-80mm
Motor power 15kw
Weight of whole machine 400kg/600kg
Outline size 1600*700*1300mm
 
 

Online Message