菠萝蜜视频app在线观看

Your location: Home Page > Mortar conveying pump > 菠萝蜜视频app污片 truck
 Two construction pump

Two construction pump

Classification: concrete pump truck Order hotline: 15131066788

Introduction and parameters

The two construction pump product introduction:

    Two construction pump The pump is light in weight, equipped with walking wheels, convenient for movement and unique in design. It can be placed directly on the floor, and is not subject to pumping height. It is effective to solve the problem that the top part near the bottom beam section is difficult to be poured in high quality during the pouring process of the structural column, so as to ensure the smoothness and the quality of the structural column. It is suitable for transporting super fine concrete in super high-rise buildings. The building column has a high pumping efficiency, and the pumping system is 10 times of the manual construction. This effectively improves the production efficiency and saves labor costs.

The two construction pump features:

(1) the use power of the pump is very small, only 15KW. It can work only with a small generator without power supply.
(2) the small volume concrete delivery pump is the choice of many narrow construction environments.
(3) the pump is light in weight and easy to move.
(4) the pump has high configuration, full hydraulic operation, stable performance, compact structure, low failure rate and long service life.
(5) the price of the pump is substantial. There are three kinds of mini mortar pump, micro fine concrete pump and mini concrete pump for customers to choose.
(6) using the automatic air pressure technology of piston structure, the working pressure is large, the pumping distance is far away, and the pumping height is high.
Two construction pump product maintenance:

1, first of all, the lubricating oil in the bearing housing should be changed regularly, and the normal situation will be changed once a month in 6 months.
2, next, keep the motor track free from moisture, prevent the motor from dampening, and damp will affect the use and safety of the equipment.
3, in the cold season, if there is an icing phenomenon after stopping the pump, it is necessary to connect the cooling water at the sealing point. If necessary, the water can be heated and thawed, and then use the hand plate to move the coupling until the operation is flexible, and then drive according to the start-up steps.
4. A pump with cooling water should be connected to the cooling water before driving. When the pump is running normally, it can continue to connect. If conditions are not allowed, it can also be stopped.
5. The operation of the pump when closing the outlet valve is called the closed pressure operation state. The operation time of the full plastic pump or the lining plastic pump should be reduced as short as possible. The normal temperature medium should not exceed 5 parts, and the high-temperature medium should not exceed 2 parts.
6, the pump can not bear the weight of the import and export pipeline. The shorter the inlet pipe, the better the vertical height of the pump outlet to the valve should be as short as possible.


Two structural pump product advantages:

The two construction pump for the main two structure refers to the frame structure. After the construction of the frame beam slab column structure and the steel structure main body, two masonry, strip, girders, lintel, post, window post, constructional column, window beam and top two main structure are needed. Generally speaking, it refers to the external structure of the main body or the independent structure separated from the main body. The building outside the body decoration structure, independent doors and so on and the main body split main building need two construction of the building two construction column pump can realize long-distance high-rise building fine stone concrete mortar transportation and pouring. The distribution valve adopts advanced S tube valve, which has good sealing performance and simple and reliable structure. The eye plate and floating cutting ring are made of cemented carbide, with good wear resistance, long life and convenient replacement. The cutting ring adopts an automatic compensation gap structure. The control mode is electro hydraulic control, which has a perfect electro-hydraulic overload protection and instrument display system. It has the function of anti pump operation, easy to exclude the blockage fault, and the pumping speed can be adjusted to meet the needs of various working conditions. The centralized lubrication system is automatically controlled starting and stopping and running time by the program, thus effectively prolonging the service life of the rotating parts.
Electrical components such as contactor and pushbutton switch can be protected by IP65, PLC control, reliable operation, simple control circuit, electrical box equipped with switch, easy to operate. The main seal adopts seals, which eliminates the internal and external leakage of the hydraulic system. The bottom of the feeding height is easy to be equipped with combined units. Equipped with lifting guide wheel, mobile and positioning flexible and convenient.

Online Message